Aeroporto internazionale di Roma Fiumicino (Italia)
15 Febbraio 2016Aeroporto di Brindisi
15 Giugno 2016
DETTAGLI:
Traffico Previsto: 6 mil. Pax /year
Cliente: Aeroporti di Roma S.p.A.
Servizio: Preliminary and detailed design
Anno: 2016
OBIETTIVO:
specialist surveys and detailed design for the pavement refurbishment and overall taxiway upgrade to meet the ICAO Code F standards requirements.Focus
Pavement surveys and design including:
-
HWD testing
-
International Roughness Index (IRI), RUT, EDT
-
Pavement Condition Index (PCI)
-
Longitudinal and transverse pavement slope correction to meet ICAO standards
-
Pavement design
-
Markings, signs and AGL
-
Works staging plan to minimize impact on airport operations.